Strategic Site Selection
An existing area is seen, examined and the conditions are determined. In case of no existing area to be seen, a site is selected strategically and land survey is conducted.
Preparing a Feasibility Report
Economic, technical and financial surveys are performed in order to make a final decision for investment. Here, the purpose is to analyze the project or operating functions systematically and in a creative way in order to offer the intended project function, performance and reliability with minimum ‘lifelong’ costs as possible so as to provide influx of data for the investor to make a decision.
Preparing a Preliminary Budget
Preliminary budget of the project is determined based on the design criteria and architectural schedule.
Master Work Scheduling
This is a specific and customized work scheduled produced for the investor only. It demonstrates the primary elements of the project in addition to the time schedule and order of works. The master work schedule that contains, as of the signing of a contract, drawing the application projects, indoor architectural design works, bidding-tender stage, construction phase and interim targets until the date of commissioning, is prepared in Primavera Project Planner (P3) software.